RE: The Lamb to the Lions' Den
The Lamb to the Lions' Den
Stardate: 53835.4
Chief Engineer's Briefing Room
USS Thunderchild
Chief Engineer Kiera Medart, Engineering Section Chiefs and Lt. Jr. Noonia
LT. Jr. Noonia Cautioned against that, citing the backup power needed to run the systems. Also stating that the current power output is well within it's parameters, it just requires a rewiring to prevent failure which happened when the Fire Suppression System failed to go off. It was stated respectfully, with a chart of the power with and without the additional system as it was at the moment. They simply would fail in wartime operations.
As always, he tried to keep his idea short and sweet, due to the fact that he was tired and was feeling it. Noonia longingly looked at the machine that would make him glorious recaff. Bed was calling him in. Noonia knew his own limits, and had yet to truly reach his failing point.
|